Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: 27-557THA-ENGCO-B-54543

Header Information

Bid Number: 27-557THA-ENGCO-B-54543 Description: Change Order Notice I-25-2005 RM Tollway (I-88), Bridge Recon at CNR, Phase II Engineering Services Bid Opening Date: 11/20/2026 12:00:00 AM
Purchaser: Carrie Williamson Organization: THA - Toll Highway Authority
Department: ENGCONSTRUCT557 - Engineering - Construction Location: AF001 - Engineering - Construction
Fiscal Year: 27 Type Code: 55 - Amendment/Change Order (increase or no dollar) Allow Electronic Quote: No
Alternate Id:   Required Date: 10/13/2026 Available Date :  10/20/2026 08:05:10 AM
Info Contact: Carrie Williamson CWilliamson@getipass.com Bid Type: OPEN Informal Bid Flag: Yes
Purchase Method: Open Market
Pre Bid Conference: 1st Supplement This is Not a Solicitation See Item Description For Details
Bulletin Desc:
Ship-to Address: Ship To - CA
2700 Ogden Avenue
Central Administration
Downers Grove, IL 60515
US
Email:
Phone: (630) 241-6800
Bill-to Address: Contract Administrator
PO Box 3094
Lisle, IL 60532-8094
US
Email: financeinvoices@getipass.com
Phone: (630) 241-6800
Print Format:
File Attachments: 2005 Supplement Change Order Notice.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
SPO Name: David Papp
Is this a Small Business Set Aside Procurement?: No
Is there a BEP/VBP Participation Goal? : Yes
If yes, BEP Goal Percentage: 32.62000
If yes, VBP Goal Percentage: 5.36000
Link to Original Contract : Purchase Order : 25-557THA-ENGCO-P-91046:0

Item Information

Item # 1:   ( 918  -  96 )   The Illinois State Toll Highway Authority is giving notice to supplement contract I-25-2005 with GFT Infrastructure, Inc. (GFT). This is a Phase II design engineering services contract on the Reagan Memorial Tollway (I-88) for reconstruction of the Canadian National Railway bridge at milepost 121.9. The contract is being amended to provide additional services that were not anticipated in the current contract. The additional work is germane to the original project and within project limits. Additional design work is needed that was not anticipated in the current contract for emergency repairs resulting from a bridge strike. An emergency construction contract (RR-26-2068) has been initiated to to provide traffic control, shoring and repairs. Additional design work to include structural design, maintenance of traffic staging, and coordination and preparation of documents for CN Railway review and approval is required to complete the repairs. The original contract was solicited on PSB 25-1 via BidBuy Bid Number 25-557THA-ENGCO-B-46484 and approved by the Tollway Board on October 21, 2025 via Board Resolution number 23098 for $7,270,899.60. This supplement increases the contract amount by $500,000.00 for a revised contract amount of $7,770,899.60.
NIGP Code: 918-96
   Transportation Consulting
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:

Additional NIGP Code: 92513, 92517, 92593

 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status