Bid Solicitation: 27-557THA-ENGCO-B-54578

Header Information

Bid Number: 27-557THA-ENGCO-B-54578 Description: CHANGE ORDER NOTICE I-20-4526 Tri-State Tollway, DSGN REQ On-call and as-needed Phase II Eng. Svs. Bid Opening Date: 11/11/2026 12:00:00 AM
Purchaser: Carrie Williamson Organization: THA - Toll Highway Authority
Department: ENGCONSTRUCT557 - Engineering - Construction Location: AF001 - Engineering - Construction
Fiscal Year: 27 Type Code: 55 - Amendment/Change Order (increase or no dollar) Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  10/22/2026 07:20:35 AM
Info Contact: Carrie Williamson CWilliamson@getipass.com Bid Type: OPEN Informal Bid Flag: Yes
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: Amendment: This is not a solicitation. See Items Tab for details.
Ship-to Address: Ship To - CA
2700 Ogden Avenue
Central Administration
Downers Grove, IL 60515
US
Email:
Phone: (630) 241-6800
Bill-to Address: Contract Administrator
PO Box 3094
Lisle, IL 60532-8094
US
Email: financeinvoices@getipass.com
Phone: (630) 241-6800
Print Format:
File Attachments: 4526 Change Order Notice V.25.1. Rev.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
SPO Name: David Papp
Is this a Small Business Set Aside Procurement?: No
Is there a BEP/VBP Participation Goal? : Yes
If yes, BEP Goal Percentage: 37.00000
If yes, VBP Goal Percentage: 5.00000
Link to Original Contract : Purchase Order : 20-557THA-ENGCO-P-21209:0

Item Information

Item # 1:   ( 925  -  17 )   This Design Upon Request contract was advertised in Professional Services Bulletin PSB 20-1 on 04/27/20, BidBuy #20-557THA-ENGCO-B-14575. Selection Committee results were determined on 6/29/20. The contract was awarded to Ciorba Group, Inc. on 8/20/20 via board resolution 22083 in the amount of $3,000,000.00. This contract is set to expire on 12/31/26. Remaining work on the contract includes design effort for drainage improvements within Katherine Legge Park located near the Hinsdale Oasis. If the contract expiration date is not extended, this work would need to be completed by a different DSE contract and there would be a loss of knowledge/history and efficiency with the change in DSE. A one-year amendment is requested. As far as the question on the 12-month extension time-frame. The timeline is required because the work requires coordination with external parties. There are 2 assumed submittals to the local agency/municipality which is a 3-4 month timeframe for each submittal to allow for the local agency to review, provide comments and for the DSE to update per comments. These 2 submittals plus another month to provide the "final" plans comes to approximately a 10 month time-frame needed beyond the current contract expiration date. We don't have hard dates at this time as we need to coordinate those with the local agency still. No additional funds are required.
NIGP Code: 925-17
   Civil Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:

Additional NIGP Code: 92513

 