Bid Solicitation: 23-420DCEO-STRTC-B-33592
Header Information
Bid Number: 23-420DCEO-STRTC-B-33592 Description: Feasibility Study RFP Bid Opening Date: 01/31/2023 01:00:00 PM
Purchaser: Eliane Minor Organization: CEO - Commerce and Economic Opportunity
Department: STRTCSOURCGPROC420 - Strategic Sourcing & Procurement Location: AW002 - Contract Manager
Fiscal Year: 23 Type Code: 15 - Request for Proposal (RFP) Allow Electronic Quote: Yes
Alternate Id:   Required Date: 12/01/2022 Available Date :  12/06/2022 09:37:49 AM
Info Contact: Contact candyce.thompson@illinois.gov Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: Vendors are encouraged to attend the optional Pre-bid Conference on 12/12/22 at 1:00 PM CST. Please refer to Section A.7 of the Solicitation Document for dial in options.
Bulletin Desc: Pursuant to CPO Notice 2020.06, State agencies shall only accept electronic submissions for competitive solicitations. Paper responses will not be accepted. For more details please see the attachment titled Notice of Electronic Submissions Only.
Ship-to Address: Candyce Thompson
607 East Adams
Springfield, IL 62701
US
Email: candyce.thompson@illinois.gov
Phone: (217)524-8148
Bill-to Address: Financial Management
500 E Monroe St
IL-5
Springfield, IL 62701
US
Email: ceo.accountspayable@illinois.gov
Phone: (217)782-7500
Print Format: Bid Print New
File Attachments: Q and A One Central Feasibility Study RFP B-33592.docx
Vendor Instruction for RFPs v23.1.docx
Notice of Electronic Submission~8.pdf
form A.docx
form B.docx
UPlan Blank~1.pdf
RFP One Central Feasiblity Study~2.docx
Form Attachments:
Required Quote Attachments
Desired Attachment Name:   Form A or Form B Description:   Failure to complete and upload will result in disqualification
Desired Attachment Name:   Offer Description:   Upload completed Offer with authorized signature here
Desired Attachment Name:   Technical Proposal Description:   Upload technical proposal here
Desired Attachment Name:   BEP Utilization Plan Description:   Failure to complete and upload will result in disqualification
SPO Name: Christopher Brinkmeyer
Is this a Small Business Set Aside Procurement?: No
Is there a BEP/VBP Participation Goal? : Yes
If yes, BEP Goal Percentage: 5.00000
If yes, VBP Goal Percentage: 0.00000
Link to Original Contract :
Amendments:
Amendment # Amendment Date Amendment Note
1 12/29/2022 02:12:05 PM The State is attaching the Q&A document. Attachment File Changes: Header 1. File 'Q and A One Central Feasibility Study RFP B-33592.docx': File 'Q and A One Central Feasibility Study RFP B-33592.docx' added .
Item Information
Item # 1:   ( 918  -  46 )   Feasibility Studies: Develop an economic development project with transportation, commercial, and residential elements.
NIGP Code: 918-46
   Feasibility Studies, Consulting
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
3,000.0   HR - Hour        
Manufacturer: Brand: Model:
Make: Packaging:

918-12; 918-96

 
Item # 2:   ( 918  -  46 )   Total of all additional costs by category. The different categories can be described in Section E.1.3. WITHOUT INCLUDING THE COST
NIGP Code: 918-46
   Feasibility Studies, Consulting
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   YR - Year        
Manufacturer: Brand: Model:
Make: Packaging:

918-12; 918-96

 
ILLINOIS_ILL_AWS_PROD_BUYSPEED_2_bso